THE CURRENT NEED FOR THE THERMGEN SOLUTION
Can be Placed Where Waste is Created or Stored
MAP OF RAPID DECLINE IN INCINERATION, THE LAST 20 YEARS
- The map below shows the locations of hundreds of prior active commercial incinerators in the US, with now all but 9 shut down.
- Transport of multiple materials, HazMat, and designated substances require significant expense, security, and liability exposures that can be avoided with on site waste destruction ThermGen provides.
- Incinerators require continual power for heating the large chambers. ThermGen is self sustaining once initially heated after 15 to 20 minutes of start up. This saves fuel and reduces emissions.